»
Ir para a página inicial
Comunicados à imprensa por "Quality"
2. fevereiro 2023
New chairlift in Bellwald with solar energy
In Bellwald in Switzerland, a new D-Line chairlift has gone into operation on time for the start of the winter season.
2. fevereiro 2023
New chairlift in Bellwald with solar energy
In Bellwald in Switzerland, a new D-Line chairlift has gone into operation on time for the start of the winter season.
18. janeiro 2023
Zugerberg funicular undergoes eco-friendly refurbishment
Over the last ten months, Garaventa replaced the track of the funicular, which was officially reopened on December 2022.
18. janeiro 2023
Zugerberg funicular undergoes eco-friendly refurbishment
Over the last ten months, Garaventa replaced the track of the funicular, which was officially reopened on December 2022.
10. outubro 2022
Doppelmayr Group acquires Carvatech
With effect from October 10, the Doppelmayr Group is to acquire the vehicle body and ropeway carrier manufacturer Carvatech from Upper Austria.