In the presence of the Governor of Vorarlberg, Markus Wallner, and the Deputy Governor of Vorarlberg, Karlheinz Rüdisser, the ground-breaking ceremony was held on Monday December 15, 2014. The new administration building in the Hohe Brücke area will offer approximately 550 modern workspaces. Completion of the construction works is scheduled to take place in the fourth quarter of 2016. The winning project of the architectural competition for the new building was officially presented to the municipality of Wolfurt as early as September 2013.
With an estimated amount of approximately EUR 50 million to be invested Doppelmayr again declare their loyalty to the location Wolfurt/Vorarlberg. The construction works for new six-floor administration building with a gross floor area of 21,000 m2 in the Hohe Brücke area start on December 15, 2014 and are scheduled to be completed in the fourth quarter of 2016. The new building will offer space for roughly 550 modern workspaces and the departments that have until now been scattered, in particular in the facilities located in Wolfurt Rickenbach, are brought together in a single building. This shall serve to facilitate and further improve communication and internal processes.
On the occasion of the ground-breaking ceremony, the Governor of Vorarlberg, Markus Wallner, and the Deputy Governor, Karlheinz Rüdisser, emphasized that Doppelmayr stands for quality made in Vorarlberg. In his speech the Governor noted that the globally operating company substantiates its trust in the production and business location Vorarlberg in an impressive manner with this construction project in Wolfurt that is worth several million euros. Doppelmayr set an "important economic impulse" with the construction. Wallner: "As there are many local companies involved, it is possible to retain added value in the region and to secure new jobs at the same time". The Governor also addressed the importance of the company as employer and dedicated training company. "The competitive ability of Vorarlberg as an economic area is essentially based on qualified employees" said Wallner and wished Doppelmayr all the best for the construction period.
The visionary architectural office 'AllesWirdGut' from Vienna submitted the winning design that was selected by a jury. The portfolio of the internationally operating architectural office ranges from single-family houses and shop design to office and cultural buildings.
The municipality of Wolfurt was involved in the project development as part of the architectural competition. The decision regarding the future of the current location in Rickenbach will also be made in cooperation with the municipality. At the moment, a re-use concept is being developed.
The new location is an ideal solution. It is not only easy to find but also easy to reach. All those who take advantage of the proximity to the motorway and those who use their bicycle to get to work will find sufficient parking spaces. Also, there is a good connection to the public transport system. This means a relief in terms of traffic for the residents in Rickenbach and the main street leading through Wolfurt.
Inquiries:
Doppelmayr Seilbahnen GmbH
Mag. Ekkehard Assmann
Head of Marketing and Public Relations
Rickenbacherstraße 8–10, Postfach 20
6922 Wolfurt / Austria
T +43 5574 604 223
F +43 5574 75590
ekkehard.assmann@doppelmayr.com
doppelmayr.com
Facts for the new office building of Doppelmayr
Client |
Doppelmayr Immobilien GmbH |
Architectural office |
AllesWirdGut Architektur ZT GmbH, Vienna |
New location |
Hohe Brücke area, Wolfurt |
Plot area |
Approximately 8.000 m² |
Gross floor area |
Approximately 21.000 m² on six floors |
Capacity |
550 modern workspaces |
Investment volume |
Approximately EUR 50 million |
Ground-breaking ceremony |
December 15, 2014 |
Geplante Fertigstellung |
Fourth quarter 2016 |
Companies involved in the construction of the new office building
Building owner |
Doppelmayr Immobilien GmbH Rickenbacherstraße 8-10, 6922 Wolfurt |
Architecture |
AllesWirdGut Architektur ZT GmbH Untere Donaustraße 13-15, 1020 Wien |
Project management |
ZIMA Holding AG Lustenauerstraße 64, 6850 Dornbirn
M.O.O.CON GmbH Wipplingerstraße 12/2, 1010 Wien |
Statics |
Mader | Flatz Ziviltechniker GmbH Am Garnmarkt 13, 6840 Götzis |
Building services |
GMI – Ing. Peter Messner GmbH Gabelsbergerstraße 12, 6850 Dornbirn |
Electrical engineering |
Ingenieurbüro Hiebeler + Mathis OG Hochstegstraße 10, 6912 Hörbranz |
Structural physics/acoustics |
Spektrum GmbH Lustenauerstraße 64, 6850 Dornbirn |
Fire control and protection |
K&M Brandschutztechnik GmbH Toni-Ruß-Straße 8, 6911 Lochau |
Front planning |
gdb Projects ZT GmbH Steinebach 13, 6850 Dornbirn |
Free space design |
Gruber+Haumer Landschaftsarchitektur OG Hauptstraße 4, Lünerseefabrik, 6706 Bürs |
Geotechnical engineering |
BGG Consult Dr. Peter Waibel ZT GmbH Graf-Kasper-Straße 2, 6845 Hohenems |
Water and environmental engineering |
Ingenieurbüro Landa GmbH Fischbachgasse 11, 6850 Dornbirn |