Over the last ten months, Garaventa replaced the track of the funicular, which was officially reopened on December 2022.
After 40 years, a new era is dawning on the Suvretta mountainside.
The funicular is an integral part of the public transport network and links the Technical University with the Bosporus.
After two challenging years, Doppelmayr Holding SE reports positive performance for the fiscal year 2021/22.
Over the last ten months, Garaventa replaced the track of the funicular, which was officially reopened on December 2022.
After 40 years, a new era is dawning on the Suvretta mountainside.
Europe’s longest funicular railway in the Swiss town of Sierre scores with an energy storage system and enhanced comfort for its passengers.
The funicular is an integral part of the public transport network and links the Technical University with the Bosporus.
Mag. Julia Schwärzler
Marketing and Public Relations
Konrad-Doppelmayr-Str. 1
6922 Wolfurt
AUSTRIA
T +43 5574 604 227
julia.schwaerzler@doppelmayr.com
doppelmayr.com
Contacto de prensa Suiza
Andreas Bonifazi
T +41 79 476 51 15
media@garaventa.com