FAQ
What does one kilometre of ropeway cost?
Generally speaking, rope-propelled systems can be built at roughly 1/3-2/3 of the costs of today’s conventional transport systems.
Generally speaking, rope-propelled systems can be built at roughly 1/3-2/3 of the costs of today’s conventional transport systems.
Mag. Julia Schwärzler
Marketing and Public Relations
Konrad-Doppelmayr-Str. 1
6922 Wolfurt
AUSTRIA
T +43 5574 604 227
julia.schwaerzler@doppelmayr.com
doppelmayr.com
Press contact Switzerland
Andreas Bonifazi
T +41 79 476 51 15
media@garaventa.com