December 18, 2013

How are the heavy ropes put on the ropeway?

This process of the construction of a ropeway is called "pulling the rope". As it is not possible to start right away with the heavy and thick rope, a thin and light rope is pulled on the ropeway first. This happens either manually, using rope winches or with the help of helicopters. Then, a thicker rope is spliced or knotted onto the thinner one and, consequently, pulled by means a of rope winch. This procedure is repeated with ropes that increase in thickness until the final rope with the correct diameter lies on the sheave assemblies of the ropeway towers.

Press contact

Mag. Julia Schwärzler
Marketing and Public Relations
Konrad-Doppelmayr-Str. 1
6922 Wolfurt
AUSTRIA
T +43 5574 604 227
julia.schwaerzler@doppelmayr.com
doppelmayr.com

 

Press contact Switzerland

Andreas Bonifazi
T +41 79 476 51 15
media@garaventa.com

Contact request

Contact us!

Tell us more about you:

What do you want to tell us?

Social networks

Goto Top